Self Redevelopment in Mumbai: The Complete Guide for Societies

A step by step guide to self redevelopment in Mumbai: what it is, Maharashtra government support, finance, the process from feasibility to occupation, the risks, and SMGK's T.E.A.M advisory.

By SMGK Editorial Desk · Updated 18 Nov 2026

Self redevelopment in Mumbai is a housing society rebuilding its own building, on its own plot, with its own appointed professionals and bank finance, instead of handing the project to a developer. The society keeps full control and the entire profit, and members typically receive about 35 to 45 percent extra carpet area compared with the 25 to 35 percent a developer usually offers. SMGK Group, building in Jogeshwari West, Andheri West and Oshiwara since 2000 with over 5 lakh sq ft delivered, runs a dedicated self redevelopment advisory, T.E.A.M, through SMGK Estate Management. This guide explains how self redevelopment works, what the Maharashtra government offers, the step by step process and the risks.

What self redevelopment means

In conventional redevelopment the society signs a development agreement, the developer funds and builds, and the developer keeps the sale component as profit. In self redevelopment the society is the developer. It appoints a project management consultant, an architect, a structural engineer and a contractor, raises a construction loan, builds the new tower, hands members their larger flats and sells the extra flats itself.

The appeal is simple:

  • Control. Design, specification, contractor and timeline are decided by the general body, not imposed.
  • Economics. The margin a developer would keep stays with the members, as extra area, better specification, a corpus fund, or all three.
  • Transparency. Every tender and payment is visible to the society.

The cost of that control is responsibility, which is why the quality of the professionals a society appoints decides the outcome.

Government support for self redevelopment in Maharashtra

The Maharashtra government has, through a government resolution and subsequent circulars, encouraged self redevelopment of cooperative housing societies. In general terms, the support framework includes:

  • Project finance through district central cooperative banks, with lending norms designed for societies rather than for developers.
  • An interest subsidy on that loan for eligible projects.
  • Additional FSI or TDR concessions over and above what a developer led project would receive, which directly increases the area available to members and for sale.
  • A stamp duty concession on certain documents, reducing transaction costs for members.
  • A single window clearance intention, with a nodal authority to coordinate approvals.

Scheme terms, eligibility and the exact percentages have been revised more than once and may change again, so verify current scheme terms with the cooperative department, the lending bank and your advisor before building them into a feasibility report. SMGK's T.E.A.M advisory tracks these changes as part of its mandate.

Self redevelopment vs developer led redevelopment at a glance

Factor Developer led redevelopment Self redevelopment
Who controls the project Developer Society general body
Typical extra carpet area for members About 25 to 35 percent About 35 to 45 percent
Who keeps profit on sale flats Developer Society
Funding Developer's capital and sales Bank loan to society, plus sales
Interest subsidy Not applicable Available for eligible projects, verify terms
Stamp duty and TDR concessions Standard Concessions available, verify terms
Member liability Low Higher, managed by advisor and bank structure
Need for strong committee Moderate Essential

For a fuller comparison, read redevelopment vs self redevelopment for housing societies.

The step by step process

1. Resolve and form a committee

The general body passes a resolution to explore self redevelopment and appoints a redevelopment committee. Transparency from day one prevents disputes later.

2. Feasibility study

An advisor studies the plot, title, existing FSI consumption, permissible FSI and TDR, road width, reservations and market prices. The output is a feasibility report showing area for members, sale area, project cost, loan size and the surplus or corpus. If the numbers do not work, stop here.

3. Title and documentation

Conveyance or deemed conveyance in the society's name is usually a precondition for bank finance. Title holders are the first T in T.E.A.M for a reason.

4. Appoint the professionals

Through a transparent tender, appoint the project management consultant, architect, structural engineer, legal advisor and, later, the contractor. A single window advisor such as SMGK's T.E.A.M coordinates Title holders, Engineers, Architects and Managers so the committee is not managing eight separate firms.

5. Finance

Apply to the district cooperative bank with the feasibility report, approvals plan and member consents. Loan sanction typically comes with disbursement linked to construction stages.

6. Approvals

Intimation of Disapproval, Commencement Certificate and related permissions are obtained in the society's name.

7. Members vacate, construction begins

Rent for the transit period is budgeted into the project cost. Progress, quality and payments are monitored by the engineers and reported to the committee.

8. Occupation, sale and closure

Members receive possession with carpet area as per RERA norms; see our explainer on carpet area vs built up area. Sale flats are marketed, the loan is repaid, and the surplus goes to the society.

Risks and how to manage them

  • Cost overruns. Mitigate with a fixed rate contract, a contingency of at least 10 percent and stage wise bank disbursement.
  • Delays. Approvals and contractor performance are the usual causes. Penalty clauses and an experienced manager matter.
  • Internal disputes. Keep every decision minuted and every tender open to all members.
  • Sales risk. If sale flats do not move, loan servicing suffers. A conservative price assumption in the feasibility protects the society.
  • Member liability. Members are collectively responsible for the loan. A well structured project keeps the loan small relative to sale value.

Because the society is effectively a developer, it must also comply with MahaRERA for the sale component. Our MahaRERA checklist is written for buyers but shows what the society will be held to.

How SMGK's T.E.A.M advisory fits in

T.E.A.M stands for Title holders, Engineers, Architects and Managers, the four groups a self redevelopment needs working together. SMGK Estate Management acts as the single window: it coordinates these professionals, prepares the feasibility, guides the society through bank finance and interest subsidy, structures the stamp duty concession and TDR rebate, and manages the project through to occupation. The society keeps full control and all profits. The advisory draws on the same construction, legal and finance leadership that has delivered SMGK's own projects such as SMGK Residency and the WOODS Platina towers. You can read about that team on our our team page and about the wider group on about SMGK.

Key takeaways

  • Self redevelopment keeps control and profit with the society and typically yields about 35 to 45 percent extra carpet area against 25 to 35 percent from a developer.
  • Maharashtra supports it with cooperative bank finance, interest subsidy, FSI and TDR concessions and a stamp duty concession; verify current scheme terms.
  • The process runs from resolution and feasibility through title, appointments, finance, approvals, construction and sale.
  • The main risks are cost, delay, disputes and sales; a strong committee and an experienced single window advisor manage them.
  • SMGK's T.E.A.M advisory coordinates Title holders, Engineers, Architects and Managers for the society.

If your society is considering self redevelopment in Mumbai, start with a feasibility conversation. Visit SMGK Estate Management, see the standard we build to at Ebony at WOODS Platina, or contact us to arrange a committee meeting.

Share
Frequently asked

Your questions, answered

What is self redevelopment of a housing society?

Self redevelopment is when a cooperative housing society rebuilds its own building on its own plot, acting as the developer. It appoints a project management consultant, architect, engineer and contractor, raises a construction loan, gives members larger new flats and sells the additional flats itself. The society keeps control and the entire profit instead of sharing it with a developer.

How much extra carpet area do members get in self redevelopment?

Members typically receive about 35 to 45 percent extra carpet area in self redevelopment, compared with about 25 to 35 percent in a developer led project. The difference comes from the developer's margin staying with the society and from additional FSI or TDR concessions available to self redevelopment. Actual figures depend on the plot, road width and current regulations.

How is self redevelopment financed in Mumbai?

Finance generally comes from district central cooperative banks under lending norms designed for housing societies, with disbursement linked to construction stages and an interest subsidy available for eligible projects under the Maharashtra scheme. Sale proceeds from the additional flats repay the loan. Verify current loan terms, subsidy conditions and eligibility with the bank and your advisor.

What are the biggest risks in self redevelopment?

The main risks are cost overruns, approval and construction delays, disputes among members and slower than expected sales of the extra flats, which affects loan servicing. They are managed with a conservative feasibility report, a fixed rate contract with contingency, stage wise bank disbursement, transparent tenders, minuted decisions and an experienced single window advisor such as SMGK's T.E.A.M.

What does SMGK's T.E.A.M advisory do for a society?

T.E.A.M, Title holders, Engineers, Architects and Managers, is SMGK Estate Management's single window self redevelopment advisory. It prepares the feasibility, coordinates all professionals, guides the society through bank finance, interest subsidy, stamp duty concession and TDR rebate, and manages the project through occupation, while the society keeps full control and profits.